(2021)
End-to-end design and installation of three cooling frames at the Radauti chipboard factory — from mechanical design and fabrication through to on-site installation, production line integration and performance verification.
PROJECT SCOPE
- 3 cooling frames designed and installed
- Mechanical design and fabrication completed
- Frames integrated into the production line
HIGHLIGHTS
- Performance verified
- Design-to-commissioning delivery














