OMV Schwechat (03/2009 - 03/2010)
GU-commissioning with the renovation, reparation and modernization of the damaged steam boiler 7 in HKWII power plant
Scope of delivery and service
- Engineering
- Renovation of the steel construction
- Renovation of the boiler
- Renovation of the electrical measurement and control technology
- Renovation of the piping system
- Commissioning
Highlight
- Time pressure
- Safety-related technical challenges
- Expansion of the VFCR-fuel system
Ort: Schwechat (Österreich)