CCPP Sagunto
Scope of Work
- Electrical/C&I installation for gas turbine, generator, steam turbine and auxiliary equipment
- Medium voltage cabling
- Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears
- Installation of the diesel standby set and battery cells. Installation of the aluminium generator bus duct
- Testing and start-up
- Electrical/C&I installation of the ventilation system for three generating units (400 MW) of a combined cycle power plant
Location: Sagunto (Spain)