CCPP Severn Power
Scope of work
- Mechanical installation of two gas turbines, two steam turbines, two generators and auxiliary equipment
- Insulation and installation of the sound enclosures
Location: Newport (Great Britain)
100t/h Pressure Reducing Station
voestalpine Stahl Donawitz BL01
District heat Vienna
NUON MAGNUM
CCPP (2 x Single-Shaft, 800 MW)
CCGT Pego
Coal-Fired Power Plant in Pakistan
Ibrahim Fibres Ltd.
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
Coolkeeragh CCGT
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
CCPP Herdecke
Combined Cycle Power Plant (Multi-Shaft, 400 MW) for CHP Öresundsverket
CHP Öresundsverket
Combined Cycle Power Plant (Multi-Shaft, 800 MW)
CCPP Knapsack
Combined Cycle Power Plant (Multi-Shaft, 800 MW)
CCPP Livorno
Combined Cycle Power Plant (Single-Shaft, 2 x 375 MW)
CCPP Campo de Gibraltar
Combined Cycle Power Plant (Single-Shaft, 3 x 380 MW)
CCPP Palos de la Frontera