voestalpine Stahl Donawitz BL01 (2011-2012)
Scope:
- Deinstallation of the existing pressure reducing station and installation of a new pressure reducing station with a steam capacity of 100 t/h, including the selective re-use of existing components
- Design, supply and installation of process piping systems for high-pressure live steam, intermediate-pressure steam, condensate, feedwater and exhaust lines
- Installation and integration of all process-critical valves and associated equipment
- Mechanical erection, piping fabrication and system connection works
- Testing, inspection and preparation for commissioning
Highlights:
- Successful replacement of a critical pressure reducing station while incorporating existing plant components
- Delivery of a complete steam and condensate infrastructure solution covering multiple pressure levels
- Complex integration of new equipment within an existing operational plant environment
- Precise installation and alignment of process piping and valve systems to ensure operational reliability
- Efficient co-ordination of engineering, supply and installation activities
- High-quality execution with a strong focus on safety, system integrity and performance
- Seamless transition from existing to new infrastructure to support uninterrupted plant operations
- Reliable project delivery in accordance with technical, quality and schedule requirements
Location: Donawitz (Austria)