OMV Petrom SA (2011-2012)
Scope of work
- Basic and detailed design of new filtering system in accordance with OMV Petrom E & P division philosophies, standards, guidelines and procedures
- Engineering for equipments, civil (concrete foundation), steel structure, piping, process engineering
- Electrical and instrumentation activities
- All engineering activities including data sheets and technical specifications
- Operability/reliability analysis (including HAZOP, HAZID STUDY);
- Project management
Spotlights
- Operating pressure: 44 barg
- Design temperature: 100°C
Accidents: 0
Location: Bulbuceni, Gorj, Romania