OMV Petrom SA (2012)
Scope of work
Capital repairs on Dynamic Department:
Turbine K1 -130;
Compressor K1 -130;
Burckhardt compressors in RC2;
Energy Group TG1;
Isomerization – 2 compressors;
AB 1200 K1 PC2 – 4 compressors;
Sliding valves (2-ways) in FCC;
Modernization of the hydraulic system turbine project ICPN;
Repairs, modernization hydraulic fan drive system;
Modernization, post-position Flowserv pumps, Sulzer Plan B 53/53;
Mounting of small equipment and pumps (rough alignment);
Static Department
Hot Feed Project implementation, which included: new feeding pipe with raw material CC (tank park – feeding pumps FP1, 2); new discharge pipeline pumps FP1, 2 – Changer FE7; mounting new connectors on columns GV 11 and TC3;
Reactive group which included the following: Replacing of cyclones in the reactor; Replacing regenerator cyclones in tr. 2; Replace of the air valve regenerator;
Implementation Optimix system to reactor and the Slurry to the column FV8;Revision to the holes room – FV11;
Tie-in works on finalization of Optimix and Slurry projects
Tie-in works on finalization of Gas Fractionation Unit Revamp
SCLPP Diesel and Gasoline Pipeline Connections Project
ISCIR due to the equipment as follows:• SG01; • Fe3;• FE2A, B; • FE7; • FE13; • GE1A, B; • GE2; • GE3;• GE14; • GE17A; • GE22A, B;
Replace the column section GV8;
Relevance interior equipment: – GV4; – GV5; – GV6; – MeV10; – FV10-11; – MeV5;
Repaired column GV11; MeV14 – cover, MeV15, MeV16;
Project RTWM (steam turbines replaced with electric motors);
Authorized pipes MP, LP;
Replace the flare line CC (DN 900);
Equalization line PB8 spheres park;
Stove pipe (part of project) section AD;
LPG pipeline (part of project) section AD;
Spotlights
Over 500 people performing in refinery during TAR
30 mechanical days
Working hours: approx. 50.000
Accidents: 0