MHKW AVA Nordweststadt
Scope of Work
Complete mechanical erection of the combustion plant and the flue gas cleaning plant of a 4-line waste-to-energy plant (line 1 and 2).
Location: Frankfurt (Germany)
Biomass Plant RBB Böblingen, Germany
Zweckverband RBB, Restmüllheizkraftwerk Böblingen
Biomass-Fired Power Plant Fechenheim, Germany
Mainova Biomasse Kraftwerk Fechenheim
Biomass-Fired Power Plant Meidensha, Thailand
VYNCKE Thailand
Energy Recovery Boiler Hirschwang, Austria
Mayr-Melnhof Karton GmbH
Energy Recovery Boiler Plant Saica PM11
Saica Paper UK Limited
Full Erection of a RDF Fired CFB Boiler (170 MWth)
Austrian Energy & Environment
HVC Waste Incineration Plant Line 5
Imtech Deutschland GmbH & Co KG
Inspection work MVA Flötzersteig/MVA Spittelau
Fernwärme Wien GmbH
Hitachi Power Europe Services GmbH / Fernwärme Wien GmbH
Vattenfall Europe New Energy
Terentenergy Wood Gasification Plant
Terentenergy