VGT-KEM Lingen
Scope of work
- Topping Gas Turbine Plant Emsland (4 x 60 MW)
- Mechanical installation (including preliminary start-up): 4 gas turbine strings Rolls Royce Trent 60, air-cooled generator and filter housing
- Electrical/C&I installation (including preliminary start-up)
- Control cabinets and low-voltage distribution, extension of cable paths, cable pulley, cable connection work and grounding
Location: Lingen (Germany)














