Christof IndustriesLogo Christof Industries

  • Christof Industries Action Plan
  • English
    • Deutsch

Search

  • More
    • Contact us
    • Careers
    • Close
  • Contact us
  • Worldwide
  • Careers
  • About us
    • Vision
    • Management
    • Worldwide
    • Close
  • Sustainability
    • Our Strategy
      • Conducting clean & safe operations
      • Developing sustainable innovations
      • Creating sustainable partnerships
      • Empowering people & supporting the community
    • Sustainability management and governance
      • Certificates & Standards
    • ESG Report & Ratings
    • Close
  • Services
    • Portfolio of Services
    • Project Development
    • Technology
    • Technology
      • Insect Technology
      • Biodiesel
      • Waste to Energy
      • ReNOx
      • Anaerobic Digestion
      • sinTion
      • Plasma Technology
      • recondOil
      • ChemWater to Value
      • Reject to Power
      • Biomass Gasification
      • Power to Gas
      • Solar Thermics
      • Waterborne Waste Management Solution
      • Biocycle
      • Solar Power
      • Desalination
      • Sewage Treatment
      • Close
    • Engineering
    • Fabrication
    • Erection & Installation of Industrial Plants
      • Specialised Plants
      • Close
    • Industrial Services
    • Close
  • Markets
    • Energy & Utilities
      • Conventional Power
      • Oil and Gas Solutions
    • Waste Recovery & Environment
      • Waste to Energy
        • Reject to Power
        • Wood Gasification Power Plants
      • Waste to Value
        • Biodiesel
        • Nutrient Recycling
    • Industry
      • Metallurgy
      • Pulp and Paper
      • Wood and Chipboards
      • Food
    • Close
  • Projects
  • News
    • News
    • Blog
    • Events
    • Videos
    • Downloads
    • Close
  • Contact us
  • Worldwide
  • Jobs & Careers

Contact

Home    References    Steel making cooling stack 350T

Steel making cooling stack 350T

Baosteel Zhanjiang lron & Steel Co., Ltd Baosteel Zhanjiang Steel Factory (2015-2020)

Project highlights:

  • Process: BOF
  • Hot metal input quantity: 345 t/heat
  • Hot metal input quantity max: 375 t/heat
  • Inlet temperature: 1450℃
  • HP operation pressure: 25~45bar
  • LP operation pressure: 4~7bar
  • Steam quantity: 32t/heat
Overview

The downstream vaporization cooling stack is an important part of the environmental protection of the long-process converter steelmaking, and their focus is to recover the gas and waste heat in the BOF furnace blowing process. Baowu Group’s new plant in Zhanjiang (Guangdong) has built the largest converter long process system in China, and this is where we are involved.

Baosteel Zhanjiang Steel is the flagship project of Baosteel Group’s second expansion, shouldering the significant responsibilities of layout, industry, and regional economic adjustments, particularly in Guangdong. It plays a crucial role in international competition and the future development of Baosteel. With its unprecedented scale and equipment investment, it holds immense strategic importance. In 2015, we assisted in establishing a cutting-edge 350t converter downstream vaporization cooling system for Baosteel Zhanjiang. Upon completion, this project will transform into a green steel enterprise with global-leading emissions control and resource utilization efficiency.

In 2019, we provided converter vaporization cooling flue equipment similar to phase I for Baosteel Zhanjiang 4# converter, which is part of the second phase of Baosteel Zhanjiang expansion project.

Baosteel Zhanjiang 350T

The Approach

This marks the first large-scale converter steelmaking system in China, where our customers rely on our process knowledge and expertise in mechanical and electrical engineering. We offer comprehensive support throughout the entire project lifecycle, from conceptualization and basic engineering to installation assistance and final commissioning. Following commissioning, we assisted in optimizing the operation of the converter’s vaporization cooling flue system and delivered fully functional equipment by 2020. Considering the energy consumption and longevity of the steelmaking system, it is crucial to assess the impact of commissioning on its overall performance. Xu Dongmin, our director of engineering involved in this project, explains: “Our focus is to maintain a balanced level of carbon monoxide and steam within the system for sustainable and efficient operations.”

Baosteel Zhanjiang phase I installation site

Challenges

With the first phase of experience, there are no problems in manufacturing. However, when it comes to transportation and installation, how to place such a huge steel structure in the completed plant is a challenge for us. Under the direction of the site construction unit and our field engineers, we successfully solved this problem and also provided valuable experience for our future installation of 300-ton equipment.

Results

Upon completion of the project, the total annual production capacity of Zhanjiang Iron and Steel steelmaking plant will reach 12.5 million tons, making it the largest single steelmaking workshop in China and a significant step towards achieving the goal of “building the highest efficiency green and intelligent steelmaking plant”.

Show all references See references on our world map

About Us

  • Christof Industries
  • Mission, Vision, and Values
  • Developing sustainable innovations
  • Certificates & Standards
  • Jobs & Careers

Turnkey Solutions & Industrial Services

  • Portfolio of Services
  • Project Development
  • Technology
  • Engineering
  • Fabrication
  • Erection & Installation of Industrial Plants
  • Industrial Services

Markets

  • Energy & Utilities
  • Waste Recovery & Environment
  • Industry

Quick Links

  • General Terms & Conditions
  • Downloads
  • Contact
  • Code of Conduct and Ethics
  • Supplier information
  • Whistleblower hotline

© 2026 Christof Industries Global GmbH

  • Privacy Policy
  • Imprint

WordPress Download Manager - Best Download Management Plugin