(2017-2018)
Installation of a high-integrity sealing system and new pipework at Ploiesti, completed with full leak-testing and pressure verification to meet plant safety requirements.
PROJECT SCOPE
- High-integrity sealing system installed
- New pipework installed to specification
- Leak-testing and pressure verification completed
- Full compliance with plant safety requirements
- Part of the long-term Ploiesti service relationship
SCOPE HIGHLIGHTS
- Sealing system installed to spec
- New pipework erected and connected
- Pressure testing and leak verification
- Safety and process requirements met
- Delivered within the shutdown programme