Christof IndustriesLogo Christof Industries

  • Christof Industries Action Plan
  • English
    • Deutsch

Search

  • More
    • Contact us
    • Careers
    • Close
  • Contact us
  • Worldwide
  • Careers
  • About us
    • Vision
    • Management
    • Worldwide
    • Close
  • Sustainability
    • Our Strategy
      • Conducting clean & safe operations
      • Developing sustainable innovations
      • Creating sustainable partnerships
      • Empowering people & supporting the community
    • Sustainability management and governance
      • Certificates & Standards
    • ESG Report & Ratings
    • Close
  • Services
    • Portfolio of Services
    • Project Development
    • Technology
    • Technology
      • Insect Technology
      • Biodiesel
      • Waste to Energy
      • ReNOx
      • Anaerobic Digestion
      • sinTion
      • Plasma Technology
      • recondOil
      • ChemWater to Value
      • Reject to Power
      • Biomass Gasification
      • Power to Gas
      • Solar Thermics
      • Waterborne Waste Management Solution
      • Biocycle
      • Solar Power
      • Desalination
      • Sewage Treatment
      • Close
    • Engineering
    • Fabrication
    • Erection & Installation of Industrial Plants
      • Specialised Plants
      • Close
    • Industrial Services
    • Close
  • Markets
    • Energy & Utilities
      • Conventional Power
      • Oil and Gas Solutions
    • Waste Recovery & Environment
      • Waste to Energy
        • Reject to Power
        • Wood Gasification Power Plants
      • Waste to Value
        • Biodiesel
        • Nutrient Recycling
    • Industry
      • Metallurgy
      • Pulp and Paper
      • Wood and Chipboards
      • Food
    • Close
  • Projects
  • News
    • News
    • Blog
    • Events
    • Videos
    • Downloads
    • Close
  • Contact us
  • Worldwide
  • Jobs & Careers

Contact

Home    References    RWE Gas Turbine – Peaker

RWE Gas Turbine – Peaker

(July 2021 – April 2023)

Key Facts:

  • Customer: RWE Generation SE
  • Project duration: July 2021 – April 2023
  • Electrical output: ~ 48 MW

With this project, the client intends to generate the energy required on short notice to cover power peaks in their local energy grid. The energy required for this is generated by coupling an aircraft turbine (type LM 6000) to a generator. Natural gas is used as an energy source.

For the realisation of this project, the client purchased the core components of a “peaker” (based on a prototype), such as the turbine-generator package, parts of the BoP (Balance of Plant), and the basic automation from their technology partner, Pro Energy Service, in Seddelia, USA, and important them to Germany.

Christof Industries was entrusted as EPC partner with the completion of the process plant.

Project scope:

  • Conversion of the American plant to European standards in order to achieve CE conformity
  • Comprehensive basic and detailed engineering package for electrics and mechanics
  • Production and delivery of a complete MCC (Motion Control Centre) for all process drives and auxiliary units
  • Safety extra-low voltage distribution (SELV)
  • Design and in-house production of the complete supply and exhaust air ducting for the cooling and combustion air for the turbine and the generator
  • Design and manufacture of the complete exhaust system/ stack in stainless steel (~ 450°C)
  • Complete electrical and mechanical assembly for all of the customer’s provisions (turbine, generator, BoP) as well as all components and system parts included in Christof Industries’ scope of delivery
  • Completion of the plant to form a functional unit
  • Support for the customer during the commissioning of the “peaker”

Highlights:

The complexity of the interfaces, such as the new CO2 extinguishing equipment, the integration of the existing block protection system into the new process plant at the operating site, and constant project changes in the technical and organisational areas represent a major challenge for the Christof Industries project team.

 

Show all references See references on our world map

Similar Projects

Installation 2 Process Gas Cooler Packages

07/2018 – 11/2018

Installation of a Synchronous Condenser

03/2019 – 11/2019

Power Plant – Installation of 2 Gas Turbine Lines

2021-2024

About Us

  • Christof Industries
  • Mission, Vision, and Values
  • Developing sustainable innovations
  • Certificates & Standards
  • Jobs & Careers

Turnkey Solutions & Industrial Services

  • Portfolio of Services
  • Project Development
  • Technology
  • Engineering
  • Fabrication
  • Erection & Installation of Industrial Plants
  • Industrial Services

Markets

  • Energy & Utilities
  • Waste Recovery & Environment
  • Industry

Quick Links

  • General Terms & Conditions
  • Downloads
  • Contact
  • Code of Conduct and Ethics
  • Supplier information
  • Whistleblower hotline

© 2026 Christof Industries Global GmbH

  • Privacy Policy
  • Imprint

WordPress Download Manager - Best Download Management Plugin