(2015-2016)
Rotating equipment repair at Azomures, combined with the design and erection of two hydrogen recovery skids, was delivered concurrently to optimise the overall project schedule.
PROJECT SCOPE
- Rotating equipment repaired at Azomures
- 2 hydrogen recovery skids designed and erected
- New skids integrated into the production process
SCOPE HIGHLIGHTS
- Both scopes executed in parallel
- Schedule optimised