(2017-2019)
RIG move operations at the Hurezani upstream site, coordinating safe and efficient relocation of drilling equipment between well locations to minimise non-productive time.
PROJECT SCOPE
- RIG move operations at Hurezani site
- Safe relocation between well locations
- Non-productive time minimised
- Logistics planned in detail for each move
HIGHLIGHTS
- RIG moved between well locations
- HSE compliance throughout
- Equipment and personnel protection














