(04/2020 - 07/2022)
Revamp of railway loading stations 3 and 4 at Ploiesti, modernising critical product transfer infrastructure with mechanical refurbishment, pipework upgrades and updated loading systems.
Scope:
- Railway loading stations 3 and 4 revamped
- Mechanical refurbishment of transfer infrastructure
- Pipework and loading system upgrades
- Operational efficiency and safety improved
- Minimal disruption to refinery logistics
Highlights:
- Stations 3 and 4 fully revamped
- Mechanical refurbishment completed
- Pipework and loading systems upgraded
- Safety improvements delivered
- No disruption to ongoing logistics














