(2016-2017)
International deployment to Kingston, Jamaica, to repair two GE gas turbines — JPS GT10 and GT5 — at a power station, recommissioning both units on schedule and restoring critical generation capacity to the national grid.
PROJECT SCOPE
- Two GE gas turbines repaired at Kingston power station
- Specialist turbine inspection and refurbishment
SCOPE HIGHLIGHTS
- Both units recommissioned on schedule
- International mobilisation to Jamaica
- National grid capacity restored