Supasteel Limited (2008-2009)
Scope of Work
- Repair, installation and commissioning Turbo Main Air Blower 16 K01 Compressor in FCC Unit
- Reconditioning of rotary assembly & bearings compressors 12 K01, 16 K02, Turbine C.O. Boyler 16-KT-03B, 12-KT-01
Accidents: 0
Location: Kaduna (Nigeria)














