(07/2018 – 08/2018)
- Disassembly of the complete production line in Hollabrunn (Lower Austria)
- Packing and loading of the entire production line, transport from Hollabrunn to Wolfern
- Unloading and placing the parts
- Re-installation with commissioning support in Wolfern/Steyr (Upper Austria)
Highlights:
- Exact scheduling together with the customer
- Complex removal / special transport of the freezer due to its dimensions
(LxWxH 6,5m x 3,2m x 3,5m ) - Adaptation work at the new installation site
Location: Hollabrunn, Austria