CCGT Didcot
Scope of Work
- Dismantling of two gas turbines, two filter houses and the exhaust-gas diffusors
- Re-installation of two gas turbines (243 MW each) including sound enclosures as well as piping for the cooling water system and the fuel gas pipes of the two gas turbines.
Location: Didcot (Great Britain)