Sappi Austria GmbH (2006-2007)
Scope of Work
Project „Tiger“: Complete installation of a HRSG with auxiliary firing behind Siemens SGT-800 gas turbine (42 MW) incl. steel structures, piping and stack (Height 75 m).
Steaming rate: 165 t/h, 120 bar, 520 °C
Location: Gratkorn (Austria)