(02/2018 – 10/2019)
Electrical installation for one of Europe’s most advanced cardboard machines, covering cable routing, drive system wiring, motor connections and commissioning.
Project scope
- Cable trays/cable pulling – 46,800 m/486,500 m
- Cable connection/equipment installation – 14,000 pcs./900 pcs.
- Lightning protection – 8,000 m
- Machine cable trays/cable conduit – 400 m/2,300 m
- Cabling & connection monitoring systems – 2,200 sensors
- Installation of equipment – 2,500 pcs
Highlights:
- Project size: ~ 187,000 man-hours
- Material: stainless steel cable conduits, bent and crimped; hydraulic clamps in aluminium
Location: Grums, Sweden