(2021-2024)
Installation of two gas turbine lines at a combined pharma and energy site in Frankfurt, covering mechanical erection, piping, auxiliary system integration and OEM-coordinated commissioning to achieve safe first fire.
PROJECT SCOPE
- 2 gas turbine lines installed at the Frankfurt site
- Mechanical erection and piping installation
- Auxiliary systems integrated
- Commissioning coordinated with the turbine OEM
HIGHLIGHTS
- OEM commissioning coordination
- Brilliant performance in a technically high-sophisticated project