(09/2018 – 11/2018)
- Assembly gas control stations/ gas-air control stations
- Delivery and installation gas piping welded DN 15 to DN 150
- Delivery and installation Combustion air supply flanged DN 100 to DN 250
- Delivery and installation of crushed cooling water piping DN 10 to DN 80
- Delivery and installation of compressed air and measuring lines
Highlights:
- Extremely short installation period
- Work made more difficult by parallel demolition work at the start of Installation
- Routing of pipelines without isometrics
Location: Kremsmünster, Austria