Christof IndustriesLogo Christof Industries

  • Christof Industries Action Plan
  • English
    • Deutsch

Search

  • More
    • Contact us
    • Careers
    • Close
  • Contact us
  • Worldwide
  • Careers
  • About us
    • Vision
    • Management
    • Worldwide
    • Close
  • Sustainability
    • Our Strategy
      • Conducting clean & safe operations
      • Developing sustainable innovations
      • Creating sustainable partnerships
      • Empowering people & supporting the community
    • Sustainability management and governance
      • Certificates & Standards
    • ESG Report & Ratings
    • Close
  • Services
    • Portfolio of Services
    • Project Development
    • Technology
    • Technology
      • Insect Technology
      • Biodiesel
      • Waste to Energy
      • ReNOx
      • Anaerobic Digestion
      • sinTion
      • Plasma Technology
      • recondOil
      • ChemWater to Value
      • Reject to Power
      • Biomass Gasification
      • Power to Gas
      • Solar Thermics
      • Waterborne Waste Management Solution
      • Biocycle
      • Solar Power
      • Desalination
      • Sewage Treatment
      • Close
    • Engineering
    • Fabrication
    • Erection & Installation of Industrial Plants
      • Specialised Plants
      • Close
    • Industrial Services
    • Close
  • Markets
    • Energy & Utilities
      • Conventional Power
      • Oil and Gas Solutions
    • Waste Recovery & Environment
      • Waste to Energy
        • Reject to Power
        • Wood Gasification Power Plants
      • Waste to Value
        • Biodiesel
        • Nutrient Recycling
    • Industry
      • Metallurgy
      • Pulp and Paper
      • Wood and Chipboards
      • Food
    • Close
  • Projects
  • News
    • News
    • Blog
    • Events
    • Videos
    • Downloads
    • Close
  • Contact us
  • Worldwide
  • Jobs & Careers

Contact

Home    References    Petrobrazi Refinery – TAR 2012

Petrobrazi Refinery – TAR 2012

OMV Petrom SA (2012)

Scope of Work

Capital repairs on Dynamic Department:
Turbine K1 -130;
Compressor K1 -130;
Burckhardt compressors in RC2;
Energy Group TG1;
Isomerization – 2 compressors;
AB 1200 K1 PC2 – 4 compressors;
Sliding valves (2-ways) in FCC;
Modernization of the hydraulic system turbine project ICPN;
Repairs, modernization hydraulic fan drive system;
Modernization, post-position Flowserv pumps, Sulzer Plan B 53/53;
Mounting of small equipment and pumps (rough alignment);

Static Department

Hot Feed Project implementation, which included: new feeding pipe with raw material CC (tank park – feeding pumps FP1, 2); new discharge pipeline pumps FP1, 2 – Changer FE7; mounting new connectors on columns GV 11 and TC3;
Reactive group which included the following: Replacing of cyclones in the reactor; Replacing regenerator cyclones in tr. 2; Replace of the air valve regenerator;
Implementation Optimix system to reactor and the Slurry to the column FV8;Revision to the holes room – FV11;
Tie-in works on finalization of Optimix and Slurry projects
Tie-in works on finalization of Gas Fractionation Unit Revamp
SCLPP Diesel and Gasoline Pipeline Connections Project
ISCIR due to the equipment as follows:• SG01; • Fe3;• FE2A, B; • FE7; • FE13; • GE1A, B; • GE2; • GE3;• GE14; • GE17A; • GE22A, B;
Replace the column section GV8;
Relevance interior equipment: – GV4; – GV5; – GV6; – MeV10; – FV10-11; – MeV5;
Repaired column GV11; MeV14 – cover, MeV15, MeV16;
Project RTWM (steam turbines replaced with electric motors);
Authorized pipes MP, LP;
Replace the flare line CC (DN 900);
Equalization line PB8 spheres park;
Stove pipe (part of project) section AD;
LPG pipeline (part of project) section AD;

Spotlights

Over 500 people performing in refinery during TAR
30 mechanical days

Working hours: approx. 50.000

Accidents: 0


Show all references See references on our world map

Similar Projects

120R2 Reactor Replacement

07/2020

15 Years of Maintenance & Repairs – Rotating & Static Equipment

2010-2025

8-Year Predictive Maintenance Programme – Rotating Equipment

2013-2027

AMMONIA 3 & 4

Casale/Azomures

2015-2016

Ashdod Refinery – Turnaround

PAZ

May 2017

Azomures Turnaround

2012 – 2020

Back Pressure Turbine and Power Generator

OMV Petrom SA

2014

CENTRAL HYDROCARBON DEW POINT HUREZANI

OMV Petrom

2017-2019

Central Workshop Targu Jiu (GAP)

Coke Cutting Tower Repair – Cutting Systems & Water Pipe Repairs

2024

Columns, HEX, Air Coolers & Vessels

2022

Complete reconstruction after fire damage HKW II DK7

OMV Schwechat

03/2009 - 03/2010

Converting Wet Mechanical Seals to Dry Mechanical Seals

Elliot Turbomachinery S.A

2013

DAV/COKER UNIT

OMV Petrom

2011 – 2012

Design & Execution Drawings of Thermal Oil Routes

2024

About Us

  • Christof Industries
  • Mission, Vision, and Values
  • Developing sustainable innovations
  • Certificates & Standards
  • Jobs & Careers

Turnkey Solutions & Industrial Services

  • Portfolio of Services
  • Project Development
  • Technology
  • Engineering
  • Fabrication
  • Erection & Installation of Industrial Plants
  • Industrial Services

Markets

  • Energy & Utilities
  • Waste Recovery & Environment
  • Industry

Quick Links

  • General Terms & Conditions
  • Downloads
  • Contact
  • Code of Conduct and Ethics
  • Supplier information
  • Whistleblower hotline

© 2026 Christof Industries Global GmbH

  • Privacy Policy
  • Imprint

WordPress Download Manager - Best Download Management Plugin