(2021)
Comprehensive chipboard factory overhaul, including specialist HGG steam boiler maintenance — inspecting pressure components, repairing refractory and heat transfer surfaces, and returning the boiler to full pressure equipment directive compliance.
PROJECT SCOPE
- Chipboard factory comprehensive overhaul
- HGG steam boiler specialist maintenance
- Pressure-retaining components inspected
HIGHLIGHTS
- Refractory and heat transfer surfaces repaired
- The boiler returned to the pressure equipment standard














