Hitachi Power Europe Services GmbH / Fernwärme Wien GmbH (11/2010 - 12/2015)
EPC – engineering, supply and erection: 2 x 125,000 t/a energy from waste plant
Scope of Supply and Services
Erection of whole delivered equipment; engineering, delivery and erection of steel construction, external isolation together with engineering, delivery and assembly of support systems.
Spotlights
Based on the restricted space – power plant is located in the middle of Vienna – the logistics are a big challenge. The execution period is about 4 years. During erection of the plant, one waste incineration line has to stay in operation.
Location: Vienna (Austria)










