(11/2016)
Revamp of the MSCC reactor at Turkmenbashi with installation of a new cyclone separation system. Remote location deployment was managed successfully, significantly improving reactor separation performance.
PROJECT SCOPE
- MSCC reactor revamp executed
- New cyclone separation system installed
- Specialist fabrication and installation techniques applied
- Remote Central Asia deployment managed
- Reactor separation performance improved
SCOPE HIGHLIGHTS
- MSCC reactor revamped
- Cyclone system designed and installed
- Remote location deployment
- Specialist fabrication knowledge applied
- Improved separation performance achieved














