(2019-2021)
Based on pre-engineering, the customer was looking for a long-term strategic partner who could provide the necessary engineering activities for industrialization as well as the required production capacities. As the system was to be a scalable product that would be installed at customer sites worldwide, the decision was made in favour of a modular Skid system solution. This type of system enables the scaling of the product and correspondingly fast lead times.
Task
Development and Delivery of a Turn Key Skid Solution in <40 Weeks
Particular Challenges
There was no PoC at the start of the project, and technical process details had to be worked out during the engineering phase. Furthermore, precautions had to be taken in order to be able to make process-related adjustments at a later date. The project lead time (<40 weeks) was also a particular challenge.
Scope of Work
Basic and detailed engineering, manufacturing and FAT testing, delivery and assembly at end customer (Germany, Sweden, Mexico, Spain, etc.) Commissioning support for the customer.
Further Projects for Industrial Skid Solutions
Modularized Facility Supply for an Automotive Test Field.