(2024)
Installation of DN80 connections and the DN250 thermal oil pipeline route at Radauti, with precision pipefitting, welding, pressure testing and flushing to verify system integrity before handover.
PROJECT SCOPE
- DN80 connections installed to thermal oil specification
- DN250 thermal oil pipeline route installed
- Precise pipefitting and welding completed
- Pressure testing and flushing performed
HIGHLIGHTS
- System integrity verified














