(03/2019 – 11/2019)
- Mechanical and electrical installation of a Synchronous Condenser
- Rotor installation on the construction site
- Installation air cooler, oil skid, cooling fan
- Delivery and assembly of cooling water piping, lifting oil and lubricating oil piping including painting
- 700 m cable support system, 12,000 m cable, 1,200 cable connections, 70 switch or terminal boxes, battery system with 204 cells
Highlights:
- Work within the substation with high safety standards
Location: Transformer Station Uchtelfangen, Germany