Task:
- Automation of chemical dosing for the purpose of neutralising pre-treated industrial wastewater before it is discharged into a receiving water course.
- The customer wanted a complete solution, from engineering to installation on-site.
- Highest quality requirements from the customer (including 100% RT testing).
- Two stainless steel cabinets insulated with heating and ventilation to keep the temperature inside the cabinets between 15° C and 30° C.
- Development and delivery of a turnkey skid solution in under 12 weeks.
Chemicals used:
- Caustic soda NaOH-30%
- Sulphuric acid H2SO4-95%
Scope of work:
- Basic engineering (process planning),
- Detail engineering (mechanical and electrical design),
- Manufacturing (assembly and cabling),
- In-house FAT,
- Installation on site,
- Optional support with SAT.