Salzburg AG (2011)
Scope of delivery and service
- Construction and commissioning including test run of one steam block on site at 18 MW
- High temperature uncoupling from the existing low pressure component of the waste heat boiler
- Uncoupling from the high pressure steam header
- Construction of a new backup warm water boiler (6 MW) on the site of the University Hospital Salzburg
Ort: Salzburg (Austria)