Project Scope
- Unloading and incoming goods inspection of all deliveries
- Alignment and installation of GIS components for five bays of the 8DQ1 switchgear system
- Installation of 55,000 kg of structural steel, including ladders, staircases and platforms
- Installation of control cabinets and terminal boxes
- Installation of cable trays, cable pulling and cable termination
- Leak testing and SF₆ gas filling
- Commissioning assistance, including high-voltage testing
Highlights
- During the project, one employee was certified for 8DN8 switchgear systems
Obtained certification for working with SF₆ gas in high-voltage switchgear installations