Xervon Energy GmbH (2011/02 - 2011/07)
Pre-assembling and insertion of 1 x 156 t/h blast furnace gas boiler
Scope of Supply and Services
Subject of the contract is the complete erection of the boiler incl. burner on the pre-assembling place incl. insertion of the boiler in the “Gebläsezentrale II” on the sites of voestalpine.
Features
Erection of the complete boiler outside on a temporary erection place incl. all necessary planning activities. Insertion and final positioning of the erected boiler (400 t) within one day.
Location: Linz, Austria