Xervon Energy GmbH (08/2011 - 03/2012)
Disassembly of the old boiler and assembly of a 1 x 156 t/h furnace gas boiler
Scope of delivery and service
The contract comprised the disassembly of an existing boiler as well as the assembly of an air and flue gas system, furnace gas system, equipment, steelwork and external pipes
Highlight
- Disassembly of 500 t within ten days
- Completion of the plant during operation of line 1
- Integration of the boiler into the operating plant in fan centre II in only 48 hours