OMV Petrom E&P (2015 - 2016)
Scope of Work
- Fabrication and erection of the steel structure related to the piping works including the overcrossings of the internal (approx. 70tones)
- Pipe connections above ground (Supply materials, fabrication and erection (including pressure test) for the pipe connections; NDT and PWHT related to the pipe connections; anticorrosive protection;)
- Underground piping (Supply materials, fabrication and erection (including pressure test) for the carbon steel underground pipe connections; NDT and PWHT related to the pipe connections wrapping of the underground piping;)
Installation of static equipment
- 21-V-001-A/B/C/D – test separators
- 20-V-001-A/B/C – production separators
- 57-V-101 – close drain vessel
- 56-TK-001 – sludge vessel
- E&I container
- Electrical substation container
- 42-PK-001 – chemical injection system (temulsificstore)
- 42-PK-001 – chemical injection system ( fluidizator)
Installation of rotating equipment
- 48-P-001 – sand washing pump
- 44-P-002-A/B – produced water feed pumps
- 44-P-003-A/B – booster pumps
- 44-P-001-A/B/C – produced water transfer pumps
- 20-P-001-A/B/C – production pumps
- 57-P-001-A/B – close drain pumps
- 23-PK-001-A/B – gas compressor package
- 63-PK-001 – compressed air package
Working hours: approx. 35.000
Accidents: 0
Location: Piteşti, Romania