(2022 - 2027)
The Simmeringer Haide hazardous waste and sewage sludge incineration plant processes almost 100,000 tonnes of household waste, 110,000 tonnes of commercial and industrial waste and 225,000 tonnes of sewage sludge from the nearby ebswien main sewage treatment plant every year, generating 450,000 megawatt hours of district heating and 50,000 megawatt hours of electricity.
Scope:
Operational disruptions and interruptions are minimised through the use of highly qualified specialist personnel and compliance with strict safety requirements. Within the scope of this agreement, Christof Industries carries out inspection, maintenance, overhaul and repair work, supplemented by (dis)assembly work on key system components. This includes:
- High-pressure boiler systems
- Conveyor systems (continuous and discontinuous)
- Rotating machines (turbomachinery, pumps, agitators, blowers, beaters)
- Shredding units (rotor shears, shredders)
- Pressurised equipment (pressure vessels, heat exchangers)
- Pipelines and apparatus
- Steel construction and electrostatic precipitators
Highlights:
Christof Industries takes over responsibility for organisation and execution of the work, including
- Personnel planning
- Provision of all necessary tools and equipment
- Complete documentation of the work carried out
- Safety instructions for the personnel deployed
This agreement reflects our commitment to working with Wien Energie to ensure the highest standards of operational safety and efficiency. Depending on requirements, we support our customers in plant construction and industrial services with customised services and products.