OMV Petrom (2011-2012)
Basic and detailed Design of new filtering system in accordance with OMV Petrom E & P Division
Philosophies, Standards, Guidelines and Procedures
Scope of Work
- Engineering for equipment, civil (concrete foundation), steel structure, piping, process engineering
- Electrical and instrumentation activities
- All engineering activities including data sheets and technical specifications
- Operability/Reliability analysis (including HAZOP, HAZID STUDY)
- Project Management
Spotlights
- Operating pressure: 44 barg
- Design temperature: 100°C
Location: Bulbuceni, Romania