Uhde Bad Soden / Petrom S.A. (2008-2009)
Scope of supply and services
700 t pipe construction including mountings and fittings
Highlight
- Project administration together with local authority ISCIR
- Integration of various West European experts in the local Romanian team
- Low quality delivery situation (NDT, annealing…)
- Due to time pressure works were often carried out in parallel instead of sequentially under extremely restricted spatial conditions and while the refinery was in operation, nine months from the beginning of pre-fabrication to the end of assembly.
Ort: Ploesti (Romania)