(03/2018 – 01/2019)
- Cable trays (main ways and sub ways) – 1,600 m
- Cable pulling (electrical installation and earthing) – 40,000 m
- Cable connection – 11,200 pcs.
- Equipment installation (signal towers, scanners, transmitters) – 500 pcs.
- Equipotential bonding – 4,100 m
Location: Dortmund, Deutschland