CCPP Kårstø
Sope of Work
- Mechanical and electrical / C&I installation for a steam turbine (HIP+LP) including generator and condenser, a gas turbine including generator, gas turbine piping
- Installation of the sound enclosures, the fire fighting system and auxiliary equipment as well as insulation
- Electrical/C&I installation for a CCP plant
- Installation of the switch gear, main transformer, the auxiliary transformer and the medium voltage switch gears
- Installation of the diesel standby set and battery cells
- Installation of the aluminium generator bus duct
- Installation of the entire lighting for turbine hall, boiler and the outside facilities
Location: Tysværvåg (Norway)