CCPP T-Power
Scope of Work
- Mechanical and electrical/C&I installation of a HRSG unit, a gas turbine, a generator as well a steam turbine including condenser
- Mechanical installation of the auxiliary equipment, the sound enclosures, the fire fighting system as well as insulation
Complete installation of a HRSG plant supplied by NEM b.v. (horizontal gas flow, natural circulation) behind Siemens SGT 5-4000F gas turbine incl. auxiliary equipment. Total installation quantity: approx. 3.750 tons
Location: Tessenderlo (Belgium)