(2024)
Project Scope

Building on our proven track record with several successful projects in the pet food industry, we were assigned to supply an additional cold water expansion skid.
The challenge was that the factory’s existing cold-water supply could not maintain the low temperatures required for the process. To solve this, we engineered a skid system that stores 400 litres of water at a constant 7°C.
Our skid is engineered to the highest standards for food safety and hygienic design.
Thanks to our in-house engineering and manufacturing capabilities, we delivered the system within 20 weeks, allowing the customer to launch the product line as scheduled.
Task
Engineering, manufacturing and commissioning a cold-water expansion skid in accordance with the highest food safety and hygienic design standards.
Particular challenges
Given that this skid is designed for a customer in the pet food industry, we must ensure that the steel framing or piping does not have unnecessary gaps.
Additionally, we faced challenges with the chiller system, which was necessary for the cold-water expansion skid to function.
During the installation on-site, we had to comply with high work safety standards and ensure that it did not interrupt the food production in the surrounding product area.
Scope of work
- Basic Engineering (Process design),
- Detail Engineering (Mechanical and electrical design),
- Manufacturing (Assembly and cabling),
- In-House FAT,
- Installation On-Site,
- SAT with test runs.