Zweckverband RBB, Restmüllheizkraftwerk Böblingen (2008)
A reject-to-power unit was installed at the existing municipal waste-to-energy plant for the thermal recovery of screening waste resulting from tree felling and shrubbery cuttings. These biomass residues cannot be handled by conventional biomass combustion installations due to the high content of fine particles and the low heating value. The reject-to-power plant produces superheated steam for the generation of electrical energy and for the district heat supply. The plant was integrated into the existing infrastructure.
Scope of Supply
The scope of supply included the project management, engineering, procurement, transport and logistics, delivery, construction and commissioning of the following systems:
- Incineration unit
- Water tube boiler with economiser
- SNCR system
- Flue gas de-dusting system
- Balance of plant system
- Instrumentation
- Control system
- Electrical system
Plant Description
| Thermal output: | 6,0 MW |
| Main fuel: | biomass – screening residues |
| Steam pressure: | 40 bar |
| Steam temperature: | 390 °C |
Location: Böblingen, Germany
Start up: 2008