(09/2015 – 01/2016 & 04/2016 – 05/2016)
Scope:
- civil works, erection and revamp works of equipment;
- supply, manufacturing, and installation of 260 steel structures and supports;
- prefabrication and erection of 600 to piping (wall thickness up to 45 mm, carbon, alloy and stainless steel pipes); Pipe size up to 1,200mm;
- NDT, PWHT, painting works;
- scaffolding and insulation works;
- rotating equipment repair: centrifugal compressor for natural gas and air, 25 centrifugal pumps, 10 steam turbines;
- installation of Dresser-Rand centrifugal compressor after assembly on site (4 stages), 20 Flowserve pumps;
- erection of hydrogen recovery unit (2 skids).